Today's analysis is based on:
• a peak load forecast of 16,970 MW for
HE 15 (about 200 MW below the ISO peak forecast
of 17,200 at HE 15);
• a forecasted generation out-of-service
of 3,770 MW;
• 5,750 MW of generation unavailable due-to
start-time;
• imbedded gas prices at $6.58/MMBtu, with
oil prices at $5/MMBtu;
• Net Imports averaging just under 1,800
MW;
• Millstone 2 remains in service; and
• 0 MW of test generation.